Home Decor Downwards To The Finishing Off Jobs

Forgive me readers for I accept sinned. Its been nearly a calendar month since my in conclusion blog.  I am directly only doing the in conclusion few piffling jobs that accept been hanging around.

I had the in conclusion chip of skirting board made past times DW Wood Mouldings too fitted them along amongst the in conclusion bits of plinth.

Same both sides

I accept fitted the bring upwardly door vents.

 16g SS especial order, overnice too thick

Still demand varnishing

I accept fitted the front end button.

Ready for or thence bumping directly ;-)

And finally I've fitted a alert LED to the dash to confirm the alternator parallelling is locked in.


H5N1 horrible project which I didn't photograph was the removal of a tumble of 2.5L of tar pigment inwards the chain locker.  I decided it would survive amend to permit it dry out too thence role a hot air gun to melt it into manageable slices.  It worked but took nearly an hr too the in conclusion bits inwards the corners was a existent job.

I accept decided to deed the inverter within nether the bring upwardly stairs.  I accept had a twosome of comments nearly it too I was a piffling unsure if it was a practiced reckon when I decided to pose it inwards the engine room  I volition likely create this side past times side week.